Article
Publication date: 27 November 2018

Maria Flavia Mogos, Anna Fredriksson and Erlend Alfnes

This paper aims to develop a procedure for preparing production transfers based on risk management principles. The procedure should help companies reduce the amount of supply…

Abstract

Purpose

This paper aims to develop a procedure for preparing production transfers based on risk management principles. The procedure should help companies reduce the amount of supply chain disruptions during transfers and achieve their outsourcing/offshoring objectives.

Design/methodology/approach

The procedure was developed during a three-year Design Science study. First, a literature review and case studies were conducted to frame the research problem. Second, a preliminary procedure was developed based on preventive risk mitigation actions from the production transfer literature. Third, the procedure was implemented during an electronics-offshoring case and refined during workshops with the sender and receiver’s transfer personnel. Fourth, during a seminar, transfer practitioners verified the procedure by applying it to outsourcing/offshoring cases with which they had experience.

Findings

Most of the preventive actions were evaluated as relevant for the transfers the procedure was applied to, regardless of industry and relocation type. Moreover, the electronics-offshoring case showed that the success of a production transfer not only depends on the physical, knowledge and supply chain transfers, as presented in earlier research, but also on the administrative transfer and on the organisation, project and quality management actions. This paper also attempts to enhance the production transfer literature by clarifying transfer risk management.

Practical implications

The procedure can be used during the production transfer phase as a preparation procedure. Moreover, it informs the decision-making process during the relocation-decision and supplier-selection phases.

Originality/value

To the authors’ knowledge, this is the first production-transfer-preparation procedure based on risk management principles.

Details

Journal of Global Operations and Strategic Sourcing, vol. 12 no. 1
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 2 June 2022

Maria Flavia Mogos, Anna Fredriksson, Erlend Alfnes and Jan Ola Strandhagen

This paper explores the operationalization of production network coordination – the production transfer (PT) – and the relationships between transfer risk sources, preventive…

Abstract

Purpose

This paper explores the operationalization of production network coordination – the production transfer (PT) – and the relationships between transfer risk sources, preventive actions, supply chain disruptions, corrective actions and losses to better understand how to mitigate the risk and achieve an effective transfer process.

Design/methodology/approach

A longitudinal field study of a PT process from Norway to Spain was studied in depth for 25 months.

Findings

The paper presents the implications of three areas of importance for PT success: (1) how the transfer influences the plant roles, (2) the cross-locational management of the transfer project at the sender and receiver and (3) whether adapting the transferred production to the receiver's environment is an enabler or an inhibitor of transfer success.

Practical implications

The findings about how to mitigate the transfer risk and the frameworks of risk sources, supply chain disruptions, losses and preventive and corrective actions, along with the examples from the in-depth study, can aid the practitioners in managing PTs and achieving the relocation goals.

Originality/value

This is one of the first studies of PT, which is from the perspective of both transfer parties, and addresses both preventive and corrective actions and all the transfer phases. Moreover, this study addresses the operational aspects of production network coordination, which received limited attention in earlier research.

Details

Journal of Manufacturing Technology Management, vol. 33 no. 6
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 23 November 2018

Anna Fredriksson, Anna Malm and Erik Skov Madsen

The purpose of this paper is through a literature study and a study of the Saab offset cases to identify strategies to increase inter-organizational transfer capability.

Abstract

Purpose

The purpose of this paper is through a literature study and a study of the Saab offset cases to identify strategies to increase inter-organizational transfer capability.

Design/methodology/approach

This paper is based on a literature study and a study of three of Saab’s offset cases and Saab’s process for technology transfer.

Findings

This study has identified inter-organizational transfer strategies based on the importance of the hierarchy of decision-making and the change from capacity transfers to capability transfers in offset business. The type of performance goals set in the business agreement decides how to realize the transfer. The hierarchy of decision-making creates a need to align the understanding of the performance goals between the different parts of the organization, which affect the plans for how to transfer knowledge between the organizational as well as the individual levels. To reach the performance goals of the technology transfer, there needs to be a balance between the disseminative capability of the sender and the absorptive capability of the receiver.

Research limitations/implications

This study is based on a single case within a relatively unique industry with an offset perspective and production transfers. Therefore, there is also a need for future studies to confirm the identified relationships within outsourcing/offset within other industries and other types of transfers.

Originality/value

A change from capacity transfers to capability transfers in both outsourcing/offshoring and offset business indicates that more research should be placed on the disseminative capacity of the sender. The literature review revealed that the disseminative capacity of the sender has been the subject of less research than the absorptive capacity of the receiver.

Open Access
Article
Publication date: 17 May 2022

Micael Thunberg and Anna Fredriksson

The purpose of this study is to identify how the responsibilities and costs of planning, controlling and executing the material, resource and waste flows are shifted between…

1188

Abstract

Purpose

The purpose of this study is to identify how the responsibilities and costs of planning, controlling and executing the material, resource and waste flows are shifted between actors when introducing a construction logistics setup (CLS) as a product innovation in a construction project, compared to the traditional way of organizing these activities.

Design/methodology/approach

This study is an analytical conceptual research study which aims to bring new insights into a problem through logical relationship building. Empirical data are gathered in two cases where CLSs are used, through observations and interviews regarding how the activities within the order-to-delivery process are performed. The results have been discussed at workshops with suppliers, installation companies, contractor firms and trade unions.

Findings

The outcome of this study is a model for illustrating how costs and responsibilities are shifted in the construction project and supply chain when a CLS is introduced. The cost shift is dependent on the activity shift that accompanies the services included in the setup.

Practical implications

The practical contribution of this work is twofold. First, this study provides a methodology of how to evaluate the impact of logistics services on the actors in the construction project. Second, this study shows shifts in costs and responsibilities in logistics activities with the introduction of construction logistics services.

Originality/value

The theoretical contributions of the model and this study lie in the inclusion of a multi-actor perspective in total cost modelling in supply chains.

Details

Construction Innovation , vol. 23 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 3 March 2021

Anna Fredriksson, Mats Janné and Martin Rudberg

The use of third-party logistics (TPL) setups in construction has increased but is still a new phenomenon. The purpose was to increase understanding of how structural and…

2897

Abstract

Purpose

The use of third-party logistics (TPL) setups in construction has increased but is still a new phenomenon. The purpose was to increase understanding of how structural and management dimensions are related in CLSs by describing how CTPL setups are used.

Design/methodology/approach

Ten dimensions to describe and structure CLSs were identified from the literature and used to structure a cross-case analysis of 13 Swedish CLSs.

Findings

The main findings are: (1) there are three typical initiators of CLSs: municipalities, developers and contractors; (2) CLSs are drivers for service differentiation and modularization among TPL providers as construction specific services are required; (3) CLSs play a new role in construction by coordinating logistics activities between the construction project and the vicinity of the site.

Research limitations/implications

The study is based on 13 cases in the Swedish construction context. Additional studies of CLSs in other countries are needed.

Practical implications

The ten dimensions can be used as a guide in designing a CLS and in determining the order of design decisions. The identification and structuring of CTPL services also exemplify the variety of service offerings.

Originality/value

This is one of the first cross-case analyses of CLSs enabling the characterization of CTPL setups. This study identifies how different services included in the setup relate to the roles of SCM and logistics in construction.

Details

International Journal of Physical Distribution & Logistics Management, vol. 51 no. 4
Type: Research Article
ISSN: 0960-0035

Keywords

Open Access
Article
Publication date: 21 September 2021

Mats Janné and Anna Fredriksson

The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and…

3482

Abstract

Purpose

The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and challenges of CLC utilization.

Design/methodology/approach

Adopting an activity-based cost methodology, nine construction projects' CLC utilization in a Swedish urban development project is analyzed for a time period of three years (2013–2016).

Findings

There is a difference between drivers and challenges for implementing and utilizing CLCs, which are often implemented to reduce third-party disturbances. The drivers to utilize a CLC, however, stem from achieving efficient logistics. The authors identify two different utilization strategies; the CLC is used either for just-in-time (JIT) deliveries or as a consolidation point.

Research limitations/implications

The study shows that construction logistics is to some extent repeating some mistakes of its big brother, city logistics. The study hypothesizes that there are differences between CLC implementation and utilization drivers and challenges that are often overlooked, which can explain the lack of CLC utilization.

Practical implications

The study shows that it is crucial for construction projects to develop and formulate a logistics strategy for how to utilize the setup, i.e. deciding whether to use the setup as a consolidation point leading to fewer deliveries and more materials on-site, or as JIT, leading to more deliveries but fewer materials on-site.

Social implications

CLCs can reduce environmental impact and third-party disturbances. However, to make this come true, acceptance among the users is needed. The study provides understanding of drivers and barriers for CLC implementation and utilization that can increase acceptance among users (i.e. construction projects).

Originality/value

The current study is one of the first studies to analyze CLC utilization.

Details

The International Journal of Logistics Management, vol. 33 no. 5
Type: Research Article
ISSN: 0957-4093

Keywords

Open Access
Article
Publication date: 19 April 2022

Niklas Rönnberg, Rasmus Ringdahl and Anna Fredriksson

The noise and dust particles caused by the construction transport are by most stakeholders experienced as disturbing. The purpose of this study is to explore how sonification can…

1355

Abstract

Purpose

The noise and dust particles caused by the construction transport are by most stakeholders experienced as disturbing. The purpose of this study is to explore how sonification can support visualization in construction planning to decrease construction transport disturbances.

Design/methodology/approach

This paper presents an interdisciplinary research project, combining research on construction logistics, internet of things and sonification. First, a data recording device, including sound, particle, temperature and humidity sensors, was implemented and deployed in a development project. Second, the collected data were used in a sonification design, which was, third, evaluated with potential users.

Findings

The results showed that the low-cost sensors used could capture “good enough” data, and that the use of sonification for representing these data is interesting and a possible useful tool in urban and construction transport planning.

Research limitations/implications

There is a need to further evolve the sonification design and better communicate the aim of the sounds used to potential users. Further testing is also needed.

Practical implications

This study introduces new ideas of how to support visualization with sonification planning the construction work and its impact on the vicinity of the site. Currently, urban planning and construction planning focus on visualizing the final result, with little focus on how to handle disturbances during the construction process.

Originality/value

Showing the potentials of using low-cost sensor data in sonification, and using sonification together with visualization, is the result of a novel interdisciplinary research area combination.

Details

Smart and Sustainable Built Environment, vol. 12 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 11 February 2019

Agneta Larsson and Anna Fredriksson

The purpose of this paper is to explore tactical planning potential within hospital departments. The study had two objectives: first, to develop a framework for tactical capacity…

1539

Abstract

Purpose

The purpose of this paper is to explore tactical planning potential within hospital departments. The study had two objectives: first, to develop a framework for tactical capacity planning in healthcare departments by identifying and structuring essential components for healthcare capacity management; and, second, to identify context-specific requirements and functionality demands on tactical planning processes within healthcare.

Design/methodology/approach

A framework for tactical capacity planning was developed through a literature review. Additionally, an exploratory multiple-case study was performed, with cases from three Swedish hospital departments, which provide the opportunity to study framework applicability in its natural context.

Findings

Findings illustrate how an active tactical planning process can facilitate adjustments to capacity. However, the multiple-case study shows that there are contextual differences between departments, depending on available treatments and resources that affect capacity adjustments, and how the planning process activities should be structured.

Originality/value

This project develops a framework for a tactical capacity-planning process adapted to healthcare provider contexts. By developing the framework, based on the literature and tactical level planning processes within three Swedish hospital case studies, the authors bridge gaps between theory and application regarding healthcare capacity planning.

Details

International Journal of Health Care Quality Assurance, vol. 32 no. 1
Type: Research Article
ISSN: 0952-6862

Keywords

Article
Publication date: 12 February 2019

Mats Janné and Anna Fredriksson

Although a construction logistics solution is necessary for dealing with the demands in many large urban development projects, there is a lack of research on governance mechanisms…

1207

Abstract

Purpose

Although a construction logistics solution is necessary for dealing with the demands in many large urban development projects, there is a lack of research on governance mechanisms for construction logistics solutions. Therefore, the purpose of this paper is to analyse the initiation and utilisation of a construction logistics centre (CLC) from different stakeholders’ perspectives to suggest governance mechanisms for strategic, tactical and operational levels and to develop guidelines for implementing these governance mechanisms.

Design/methodology/approach

A single case research design was used. Data were collected through interviews, site visits, observations and documentation from four stakeholder groups.

Findings

There is potential for utilising CLCs in development projects, with positive effects such as consolidation effects and enhanced planning. What is evident, however, is that the design and implementation of the CLCs must be based on a comprehensive stakeholder analysis, as there are conflicting goals between stakeholders. Governance mechanisms, including flexibility in the main contractors’ working construction process, as well as clearly stated roles, responsibilities and communication must be developed to enhance this potential.

Research limitations/implications

The conflicting goals of CLCs are identified and discussed, and the results show the need for further multi-stakeholder analysis of construction logistics solutions.

Practical implications

The experiences from the studied case are developed into practical guidelines to be used in the design of construction logistics solutions in development projects.

Originality/value

This study contributes by taking a multi-stakeholder perspective on CLCs and providing guidelines to be used in the design of construction logistics solutions in development projects.

Details

Construction Innovation, vol. 19 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Content available

Abstract

Details

Journal of Manufacturing Technology Management, vol. 32 no. 6
Type: Research Article
ISSN: 1741-038X

1 – 10 of 32